Since it's a conversion from a automatic to manual gearbox it's time to install the clutch cable. The clutch pedal needs to be mounted NOT on the brake pedal (thanks Nick from MustangsUnlimited to help me out with that)
Monday, January 27, 2014
Sunday, January 19, 2014
Open the doors
So it's time to start on the exterior, first we'll start with the door handles, of course much pictures form the dismanteling will give a good help (NOT!!!!)
Friday, January 17, 2014
Brake lines
I've ordered a new set of brake lines from MustangsUnlimited. All bends are already in the lines so no need to worry about it.
First put them all in place, then tighten them. Unfortunately it look like I'm missing the driver side brake line. So a quick call to MU and they will ship a new one. So we'll have to wait until we can put some oil into lines
First put them all in place, then tighten them. Unfortunately it look like I'm missing the driver side brake line. So a quick call to MU and they will ship a new one. So we'll have to wait until we can put some oil into lines
Sway away
Ok we are almost ready with the rear end, still have to add the sway bar. New spaces ordered so that makes the installation very easy.
Thursday, January 9, 2014
Suspension
Installing the rear suspension is quite easy, just putting the suspension on the correct places and add the new rubbers on it.
Tuesday, January 7, 2014
Up to the Front Brakes
Since the rear brakes are installed it's time to go to the front. Installing the brake booster and front callipers. Meanwhile install the fuel line.
Monday, January 6, 2014
Rear Brakes
Startup from bottom to up! Let's start with the rear brakes installation. Luckily I had the rear brakes already mounted on the axle, so we still had to add the callipers and connect the sway bar.
Wednesday, January 1, 2014
home sweet home
So a new year has started and we are ready to assemble our very sweet Eleanor. We estimate to be finished in 4-5 months. Lets hope we don't screw up.
Subscribe to:
Posts (Atom)